Oil & Gas Services

Well Head Tie In – Piping & Mechanical Works

Construction & Installation of Well Head Activities including the following but not limited to;

  • Fabrication Supply & Installation of
    • Guard rails
    • Crash barriers,
    • Wellhead platform,
    • PPS
    • Removable anchors.
    • Pipe Spools
    • SS Piping & Annulus lines.
    • Well, Site markers,
    • Drill Site markers,
    • Flow Line markers,
    • Stenciling on Pipe Lines.
    • GI Gratings
    • Fencing, Gates & Accessories
    • Civil Foundations.
  • Supply & Installation of
    •   STOPAQ wrapping and testing
  • Installation, testing & commissioning of
    • Multi-Phase Flow Meters with spool fabrication & piping
    • CIS Skid
    • Valves & Fittings
    • Ultra Sonic Flow Meters
  • Blasting and coating Pipe Line, structures & platforms
  • Testing for Pipe Line including PMI, RT & NDT.
  • Cleaning & flushing of Pipe Line, Leak testing, Hydro Test, and torquing.
  • Swinging the blind 12″/16″/20″/24“/ 36” and reinstating of spectacle plate, Including trunk line tie-in
  • Testing and commissioning of the Installed equipment

Well Head Tie In E & I Works

Construction & Installation of Well Head Activities E & Works including the following but not limited to;

  • Supply Installation
    • Power Control & Instrumentation Cables
    • Lighting Panels
    • Communication Panels
    • Fire Alarm Panels
    • Cable Trays
    • Conduits & Accessories
    • Instrumentation Tubes, Fittings & Accessories
    • Light Poles, Fixtures & Fittings
    • Earthing Rod’s Cables, Fitting & Accessories
    • Power & Utility Sockets
  • Fabrication & Installation
    • Cable Tray Supports
    • Conduit Supports
    • Switch Rack Supports
    • Supports of the Tubes/ Fittings
  • Installation, testing & commissioning
    • Switch Rack
    • ESD Panels
    • MV/LV/VFD panel
    • Field Instruments
    • Lighting Systems
    • Ultrasonic Flow Meters
    • HMI’s
    • RTU’s
    • Siemens PLC’s
    • Testing and commissioning of the Installed equipment

Pipe Line Pre-Commissioning, Commissioning & Blind Swinging Activities

We undertake the Pipe Line Pre-Commissioning, Commissioning & Blind Swinging Activities but not limited to

  • Pre-commissioning of Pipe Line
  • Pressure Testing of Pipe Line
  • Cleaning & Flushing of Pipe Line
  • Air Blowing and drying of the Pipe Line
  • Nitrogen Purging of Pipe Line
  • Chemical cleaning of the pipeline
  • Blind Swinging Activities